Recharge#
recharge loads or generates diffuse recharge forcing. It can be consumed
directly by MODFLOW-style flow processes, inspected in hydrological summaries,
or used in controlled analytical and synthetic cases.
Accepted sources#
Source |
Use when |
Source page |
|---|---|---|
|
Local recharge files are authoritative. |
|
|
SIM2 gridded recharge should be retrieved over the project period. |
|
|
A deterministic recharge sequence is needed for tests or examples. |
|
Minimal example#
[data.recharge]
date_start = "2000-01-01"
date_end = "2002-12-31"
[[data.recharge.sources]]
source = "sim2"
extent = "watershed"
Visual check#
Use the climatic summary for source-period checks and the water budget for post-solver confirmation that recharge was consumed as intended.
Fig. 167 For custom recharge, this is the first useful figure: the chronicle
shows coverage and aggregate input before stress-period aggregation.#
Fig. 168 For sim2 recharge, inspect the grid support as well as the temporal
forcing context. A valid file path is not enough if the spatial support or
selected period is wrong.#
Recharge Source: custom#
Use source = "custom" when a local recharge raster, NetCDF file, or time
series is the reference input.
Minimal example#
[[data.recharge.sources]]
source = "custom"
path = "data/recharge/recharge_daily.nc"
source_unit = "mm/day"
extent = "watershed"
Operational checks#
Set
source_unitwhen file metadata are missing or ambiguous.Check the date dimension against
date_startanddate_end.Confirm whether the values represent recharge only or already include runoff partitioning.
Inspect solver aggregation when the recharge is used in a transient model.
Recharge Source: sim2#
Use source = "sim2" when SIM2 recharge should be retrieved for the project
support and period.
Minimal example#
[[data.recharge.sources]]
source = "sim2"
extent = "watershed"
Operational checks#
The configured period should match the intended hydrological or simulation window.
Cache metadata should be preserved when runs must be reproducible.
Inspect forcing summaries before looking at model response.
Provider replay#
Fig. 169 The recharge replay shows both the gridded support and the selected period. This is the provider-level check to perform before values are aggregated into solver stress periods.#
Recharge Source: synthetic#
Use source = "synthetic" for deterministic recharge series in tests,
tutorials, and analytical comparisons.
Minimal example#
[[data.recharge.sources]]
source = "synthetic"
values = [0.0, 2.0, 5.0, 2.0]
start_date = "2000-01-01"
freq = "D"
source_unit = "mm/day"
runoff_ratio = 0.0
Operational checks#
State whether
valuesare absolute values or part of a waveform setup.Keep
runoff_ratioexplicit.Synthetic recharge is ideal for verifying solver assembly because the input chronology is known exactly.